Project Overview
Baleine lies in the CI-101 and CI-802 blocks offshore Côte d’Ivoire and is operated by Eni. Current interests following completed transactions are Eni 47.25%, Vitol 30% and Petroci 22.75%. The field is being developed in three phases: Phases 1 and 2 are producing, while Phase 3 reached final investment decision in May 2026 and is in execution.
Phase 1 achieved first oil in August 2023. Phase 2 started production on 28 December 2024, lifting field output to approximately 60,000 barrels of oil per day and 70 MMscf of gas per day. Following Phase 3, the field is targeted to produce 150,000 barrels of oil per day and 200 MMscf of gas per day. All produced gas is supplied to Côte d’Ivoire’s domestic market.
Phased Development and Engineering Scope
| Phase | Floating facilities | Milestone / status | Asset party / operator | Construction / conversion | Subsea scope |
|---|---|---|---|---|---|
| Phase 1 | Baleine FPSO | First oil: Aug 2023 In production |
Eni: field operator Saipem: FPSO O&M |
Saipem FPSO refurbishment and upgrade |
Saipem SURF and gas-pipeline EPCI |
| Phase 2 | FPSO Petrojarl Kong FSO Yamoussoukro |
Start-up: 28 Dec 2024 In production |
Altera Infrastructure Owner and operator of both units under a 15-year contract |
Drydocks World Petrojarl Kong upgrade and Yamoussoukro conversion |
Expanded subsea production system connecting the Phase 2 wells |
| Phase 3 | Baleine Phase 3 FPSO | FID: May 2026 In execution |
Altera Infrastructure FPSO owner and operator |
Wison New Energies Newbuild FPSO EPCIC |
TechnipFMC: flexible flowlines and risers Saipem: rigid pipelines, subsea structures, transport and installation |
Participants and roles
Key participants and their project roles.
-
Operator
Operator of the Baleine field across all three development phases.
- Scope
- Ownership and governance
-
EPCI contractor
Phase 1 SURF and gas-pipeline EPCI, Baleine FPSO refurbishment and upgrade, and long-term operations and maintenance.
- Scope
- Subsea systems
Installation contractorPhase 3 rigid pipelines, subsea structures, and associated transportation and installation work.
- Scope
- Subsea systems
-
Altera InfrastructureShipowner / lessor
Owner and operator of the Phase 2 FPSO Petrojarl Kong and FSO Yamoussoukro.
- Scope
- Ownership and governance
Shipowner / lessorOwner and operator of the Baleine Phase 3 FPSO.
- Scope
- Ownership and governance
-
Drydocks WorldIntegration assembler
Upgrade of Petrojarl Kong and conversion of Yamoussoukro.
- Scope
- Offshore facilities and operations
-
EPCIC contractor
EPCIC delivery of the Baleine Phase 3 newbuild FPSO.
- Scope
- Offshore facilities and operations
-
TechnipFMC plcEPCI contractor
Flexible flowlines and risers for Phase 3 in water depths of approximately 1,200 metres.
- Scope
- Other