PROJECT LIBRARY

Projects

Structured records of major offshore oil and gas, FPSO, FLNG and maritime projects. This page currently presents a selection of records, with more information to be added over time.

Region
Type

REGION

Americas

10 projects

Brazil · Santos Basin2

Multi-FPSO Field Development⌁
Santos Basin, BrazilProducing / Expansion

Búzios

Eight FPSOs are operating; P-80, P-82 and P-83 are under construction, while P-91 is in BOT tendering.

Operator / Owner:PetrobrasView profile →
Multi-FPSO Ultra-Deepwater Development⌁
Santos Basin, BrazilProduction and Technology Expansion

Mero

The early production system and all four full-scale FPSOs serving Mero 1 through Mero 4 are in production.

Operator / Owner:Petrobras / Libra ConsortiumView profile →

Guyana · Stabroek Block6

Offshore Oil & Gas / FPSO⌁
GuyanaUnder construction

Hammerhead

The seventh Stabroek Block development, targeting first oil in 2029.

Operator / Owner:ExxonMobil Guyana LimitedView profile →
Deepwater Development / FPSO⌁
Stabroek Block, GuyanaIn production

Liza Phase 1

First oil in December 2019; SBM Offshore operates and maintains Liza Destiny through 2033.

Operator / Owner:ExxonMobil Guyana LimitedView profile →
Deepwater Development / FPSO⌁
Stabroek Block, GuyanaIn production

Liza Phase 2

First oil in February 2022; SBM Offshore operates and maintains Liza Unity through 2033.

Operator / Owner:ExxonMobil Guyana LimitedView profile →
Deepwater Development / FPSO⌁
Stabroek Block, GuyanaIn production

Payara

First oil in November 2023; SBM Offshore operates and maintains Prosperity through 2033.

Operator / Owner:ExxonMobil Guyana LimitedView profile →
Deepwater Development / FPSO⌁
Stabroek Block, GuyanaUnder construction

Whiptail

FPSO Jaguar is advancing under a Sale & Operate model, targeting first oil in 2027.

Operator / Owner:ExxonMobil Guyana LimitedView profile →
Deepwater Development / FPSO⌁
Stabroek Block, GuyanaIn production

Yellowtail

First oil in August 2025; SBM Offshore operates and maintains ONE GUYANA through 2035.

Operator / Owner:ExxonMobil Guyana LimitedView profile →

Suriname · Block 581

Deepwater Oil & Gas / FPSO⌁
SurinameUnder Construction

GranMorgu

Suriname's first offshore oil development, centered on a 220,000-bpd newbuild FPSO and targeting first oil in 2028.

Operator / Owner:TotalEnergies / APA / StaatsolieView profile →

United States · Louisiana1

Onshore LNG⌁
United StatesEPC execution

Commonwealth LNG

A modular LNG export development in Cameron Parish, Louisiana.

Operator / Owner:Commonwealth LNGView profile →

REGION

Africa

7 projects

Angola2

Offshore Oil & Gas / FPSO⌁
Angola · Block 15/06In production

Agogo Integrated West Hub

The Agogo FPSO reached 80,150 bpd while maintaining zero routine flaring.

Operator / Owner:Azule EnergyView profile →
Offshore Oil & Gas / FPSO⌁
Angola · Blocks 31 / 31/21In execution

Greater PAJ

Five fields and 17 wells, targeting first oil in the first half of 2029.

Operator / Owner:Azule EnergyView profile →

Côte d’Ivoire · CI-101 / CI-8021

Multi-facility oil and gas development⌁
Offshore Côte d’IvoireProducing / Expansion

Baleine

Phases 1 and 2 are producing, while the Phase 3 newbuild FPSO is in execution.

Operator / Owner:EniView profile →

Mozambique · Rovuma Basin2

FLNG⌁
MozambiqueUnder construction

Coral Norte FLNG

A newbuild FLNG project using an enhanced replication of the Coral Sul design, with approximately 3.6 million tonnes per year of LNG capacity.

Operator / Owner:Eni / Area 4 partnersView profile →
Onshore LNG⌁
MozambiqueFEED / Pre-FID

Rovuma LNG

A planned development on the Afungi Peninsula comprising twelve modular, electrically driven liquefaction trains.

Operator / Owner:ExxonMobil / EniView profile →

Namibia1

Offshore Oil & Gas / Deepwater⌁
Namibia · PEL83Appraisal and development preparation

Mopane

TotalEnergies became operator of PEL83 with 40% as Mopane enters a new appraisal programme targeting a 2028 FID.

Operator / Owner:TotalEnergies / GalpView profile →

Republic of the Congo · Marine XII1

FLNG / FSU / Gas Processing⌁
Republic of the Congo · Marine XIIIn production

Congo LNG

Combined capacity of 3 mtpa, with Nguya FLNG exporting its first cargo in 2026.

Operator / Owner:EniView profile →

REGION

Middle East

4 projects

Qatar4

Offshore Oil & Gas⌁
QatarEPCIC execution

Al Shaheen Ruya

The third development phase of Al Shaheen expands production through nine wellhead platforms, a CPP, a riser platform and subsea infrastructure.

Operator / Owner:North Oil CompanyView profile →
Offshore Oil & Gas / Fixed Facilities⌁
Qatar · Maydan MahzamEPIC1 and EPIC2 awarded

Maydan Mahzam Redevelopment

QatarEnergy is redeveloping the mature offshore field through separate EPIC1 and EPIC2 packages awarded to PTSC M&C and COOEC.

Operator / Owner:QatarEnergyView profile →
LNG / Offshore Gas⌁
QatarConstruction and start-up preparation

North Field East (NFE)

Qatar’s North Field East expansion links offshore gas supply with large-scale LNG liquefaction, storage and loading at Ras Laffan.

Operator / Owner:QatarEnergyView profile →
LNG / Offshore Gas⌁
QatarEPCC and jacket fabrication cooperation

North Field West (NFW)

Qatar’s North Field West expansion adds 16 mtpa of planned LNG capacity and advances offshore jacket fabrication cooperation.

Operator / Owner:QatarEnergyView profile →