Project Overview
Mero is a major ultra-deepwater pre-salt field in Brazil’s Santos Basin, about 180 to 190 kilometres off the coast of Rio de Janeiro state in water depths of approximately 2,100 metres, with Petrobras as operator. Project interests are Petrobras 38.6%, Shell 19.3%, TotalEnergies 19.3%, CNODC Brasil 9.65% and CNOOC Petroleum Brasil 9.65%; PPSA represents the Brazilian federal government’s 3.5% interest in the adjacent non-contracted area.
The development began with the Pioneiro de Libra early production system and then progressed through Guanabara for Mero 1, Sepetiba for Mero 2, Marechal Duque de Caxias for Mero 3 and Alexandre de Gusmão for Mero 4. As of 19 August 2026, all five FPSOs were producing. When Mero 4 started production in May 2025, Petrobras reported installed oil-production capacity of 770,000 barrels per day.
FPSO Development and Engineering Scope
| Code | FPSO | Milestone | Contractor / operator | Engineering scope | Subsea scope |
|---|---|---|---|---|---|
| Mero 1 | Guanabara MV31 | First oil: May 2022 180,000 bpd |
MODEC 22-year lease and operations and maintenance |
Dalian Shipbuilding Industry VLCC hull conversion, module fabrication, installation and integration, and commissioning |
TechnipFMC Subsea EPCI for risers, flowlines, umbilicals and associated systems |
| Mero 2 | Sepetiba | Production: Dec 2023 Lease start: Jan 2024 180,000 bpd |
SBM Offshore Design and construction, installation, long-term lease and operations |
CMHI Jiangsu: CMHI-220 MPF A hull BOMESC: topsides modules, hull integration, final assembly and commissioning |
TechnipFMC Subsea EPCI for risers, flowlines, umbilicals and associated systems |
| Mero 3 | Marechal Duque de Caxias | First oil: Oct 2024 180,000 bpd; later increased to 200,000 bpd |
MISC FPSO supply and operations and maintenance over a 22.5-year charter |
CIMC Raffles: hull conversion, all-module fabrication and integration, and systems commissioning Siemens Energy: eight topsides modules and EPC for power-generation, compression and electrical systems |
TechnipFMC HISEP subsea processing iEPCI and lifecycle services |
| Mero 4 | Alexandre de Gusmão | First oil: May 2025 180,000 bpd |
SBM Offshore Design and construction, installation, long-term lease and operations |
Shanghai Waigaoqiao Shipbuilding: MPF 4 hull COSCO Shipping Offshore, Qidong: topsides integration and onshore commissioning |
— |
Participants and roles
Key participants and their project roles.
-
Operator
Operator of the Mero field, responsible for phased development, FPSO lease management and technology deployment.
- Scope
- Ownership and governance
- Relationship start
- 2010
-
Shipowner / lessor
Engineering, procurement, construction and mobilization of FPSO Guanabara MV31, followed by a 22-year lease and operations and maintenance services for Mero 1.
- Scope
- Offshore facilities and operations
- Relationship start
- 19 Dec 2017
-
Shipowner / lessor
Design, construction, installation, long-term lease and operations services for FPSO Sepetiba and FPSO Alexandre de Gusmão, serving Mero 2 and Mero 4.
- Scope
- Offshore facilities and operations
- Relationship start
- 11 Dec 2019
-
MISC BerhadShipowner / lessor
Supply of FPSO Marechal Duque de Caxias and operations and maintenance services during the 22.5-year charter for Mero 3.
- Scope
- Offshore facilities and operations
- Relationship start
- 17 Aug 2020
-
TechnipFMC plcEPCI contractor
Subsea EPCI for the Mero 1 and Mero 2 risers, flowlines and umbilicals, plus the Mero 3 HISEP subsea processing iEPCI scope and lifecycle services.
- Scope
- Subsea systems
- Relationship start
- 6 Feb 2019
-
Dalian Shipbuilding Industry Co., Ltd.Integration assembler
VLCC hull conversion, module fabrication, module installation and integration, and commissioning for FPSO Guanabara MV31.
- Scope
- Offshore facilities and operations
- Relationship start
- 2 Aug 2018
-
BOMESCIntegration assembler
Topsides module fabrication, hull integration, final assembly and commissioning for FPSO Sepetiba.
- Scope
- Offshore facilities and operations
-
China Merchants IndustryHull builder
Construction and delivery of the CMHI-220 MPF A Fast4Ward hull for FPSO Sepetiba at the Haimen yard of CMHI Jiangsu.
- Scope
- Offshore facilities and operations
- Relationship start
- 25 Jul 2019
-
Integration assembler
Hull conversion, fabrication and integration of all modules, and FPSO systems commissioning for FPSO Marechal Duque de Caxias.
- Scope
- Offshore facilities and operations
-
Siemens EnergyTopsides builder
EPC delivery of eight complete topsides modules, including power generation, compression and electrical systems, with installation and commissioning support for Mero 3.
- Scope
- Offshore facilities and operations
- Relationship start
- 19 Mar 2021
-
COSCO Shipping Offshore (Qidong)Integration assembler
Topsides integration and onshore commissioning for FPSO Alexandre de Gusmão at the COSCO Shipping Offshore yard in Qidong.
- Scope
- Offshore facilities and operations
-
Shanghai Waigaoqiao Shipbuilding Co., Ltd.Hull builder
Construction of the Fast4Ward MPF 4 hull for Mero 4 FPSO Alexandre de Gusmão.
- Scope
- Offshore facilities and operations