COMPANY PROFILE

CIMC Raffles

An offshore engineering group with yards in Yantai, Haiyang and Longkou, spanning FPSO, FLNG, FPU, specialised vessels and offshore renewables.

Company overview

CIMC Raffles traces its operating history to Yantai Shipyard, founded in 1977. Headquartered in Yantai, Shandong, it is owned 83.3% by CIMC Group and 16.7% by Yantai Guofeng Group. It operates construction bases in Yantai, Haiyang and Longkou, supported by engineering and design teams in China and Northern Europe.

Its delivery scope has expanded from hulls, modules and conversion integration to FEED, EPC and full FPSO EPCIC. The Yantai yard handles large offshore assembly, integration and commissioning; Haiyang focuses on modules, heavy structures and offshore wind; Longkou builds PCTCs, ro-ro vessels, smaller specialised vessels and jack-up units.

Core capabilities

FPSO and floating productionFLNG conversionsDrilling and production unitsOffshore renewablesPCTCs and ro-ro vesselsFEED, EPC and EPCIC

Recent representative projects

Project / asset Client or development Role Disclosed relationship and status
Greater PAJ FPSO Azule Energy FPSO FEED and EPCIC Contract signed in June 2026; first topsides steel cut at Haiyang in July 2026. The 95,000 bpd unit supports a first-oil target in H1 2029.
FLNG Esperanza Golar LNG 3.5 mtpa MKII FLNG conversion EPC Fuji LNG conversion is under way in Yantai, with yard delivery planned for Q4 2027 and Argentine service from H2 2028.
Fourth Golar FLNG / Grace Dahlia Golar LNG 3.5 mtpa MKII FLNG conversion EPC EPC contract signed in August 2026; Grace Dahlia was selected as the donor vessel, with delivery planned by end-2029.
Mero 3 / FPSO Marechal Duque de Caxias MISC / Petrobras Mero Hull conversion, all modules, integration and commissioning Delivered from Yantai in 2024 and started production on 30 October 2024.
P-80 and P-83 Seatrium / Petrobras Búzios Newbuild FPSO hulls and living quarters Both hulls were delivered in 2025; Seatrium holds the FPSO contracts with Petrobras.
P-84 and P-85 Seatrium / Petrobras Atapu and Sépia Hull, living quarters and M15B module EPC Seatrium awarded the work in 2024 for the two Petrobras FPSOs.
P-78 FPSO Petrobras project executed by Keppel Shipyard and HD Hyundai Heavy Industries Hull-block fabrication CIMC Raffles records delivery of hull blocks; Keppel held the turnkey contract and HHI delivered the hull and living quarters.
Scarabeo 5 Congo LNG FPU Saipem / Eni Congo LNG Phase 2 Yard conversion and module fabrication Converted from a drilling unit into a gas separation and compression FPU and delivered in August 2025.
Woodside Scarborough FPU McDermott / Woodside Final integration at Yantai Final integration followed float-over of the QMW topsides and COSCO Qidong hull. The unit achieved first gas in 2026.
Van Oord offshore construction vessels Van Oord Wind installation vessel and two subsea rock-installation vessels Boreas was delivered in January 2025; the second rock-installation vessel option became firm in January 2026.
Ten 7,000 CEU PCTCs Zodiac Maritime Series EPC construction The LNG dual-fuel series was delivered from January 2024 to September 2025.
Smyril Line ro-ro vessels Smyril Line Two 3,300 lane-metre clean-energy ro-ro vessels First vessel SKIPANES was delivered at Longkou in August 2026.