PROJECT PROFILE · FPSO / FSO

Baleine

A three-phase deepwater development offshore Côte d’Ivoire

Producing / Expansion

Project Overview

Baleine lies in the CI-101 and CI-802 blocks offshore Côte d’Ivoire and is operated by Eni. Current interests following completed transactions are Eni 47.25%, Vitol 30% and Petroci 22.75%. The field is being developed in three phases: Phases 1 and 2 are producing, while Phase 3 reached final investment decision in May 2026 and is in execution.

Phase 1 achieved first oil in August 2023. Phase 2 started production on 28 December 2024, lifting field output to approximately 60,000 barrels of oil per day and 70 MMscf of gas per day. Following Phase 3, the field is targeted to produce 150,000 barrels of oil per day and 200 MMscf of gas per day. All produced gas is supplied to Côte d’Ivoire’s domestic market.

Phased Development and Engineering Scope

Phase Floating facilities Milestone / status Asset party / operator Construction / conversion Subsea scope
Phase 1 Baleine FPSO First oil: Aug 2023
In production
Eni: field operator
Saipem: FPSO O&M
Saipem
FPSO refurbishment and upgrade
Saipem
SURF and gas-pipeline EPCI
Phase 2 FPSO Petrojarl Kong
FSO Yamoussoukro
Start-up: 28 Dec 2024
In production
Altera Infrastructure
Owner and operator of both units under a 15-year contract
Drydocks World
Petrojarl Kong upgrade and Yamoussoukro conversion
Expanded subsea production system connecting the Phase 2 wells
Phase 3 Baleine Phase 3 FPSO FID: May 2026
In execution
Altera Infrastructure
FPSO owner and operator
Wison New Energies
Newbuild FPSO EPCIC
TechnipFMC: flexible flowlines and risers
Saipem: rigid pipelines, subsea structures, transport and installation

Participants and roles

Key participants and their project roles.

  • Operator

    Operator of the Baleine field across all three development phases.

    Scope
    Ownership and governance
  • EPCI contractor

    Phase 1 SURF and gas-pipeline EPCI, Baleine FPSO refurbishment and upgrade, and long-term operations and maintenance.

    Scope
    Subsea systems
    Installation contractor

    Phase 3 rigid pipelines, subsea structures, and associated transportation and installation work.

    Scope
    Subsea systems
  • Altera Infrastructure
    Shipowner / lessor

    Owner and operator of the Phase 2 FPSO Petrojarl Kong and FSO Yamoussoukro.

    Scope
    Ownership and governance
    Shipowner / lessor

    Owner and operator of the Baleine Phase 3 FPSO.

    Scope
    Ownership and governance
  • United Arab Emirates

    Drydocks World
    Integration assembler

    Upgrade of Petrojarl Kong and conversion of Yamoussoukro.

    Scope
    Offshore facilities and operations
  • EPCIC contractor

    EPCIC delivery of the Baleine Phase 3 newbuild FPSO.

    Scope
    Offshore facilities and operations
  • United Kingdom

    TechnipFMC plc
    EPCI contractor

    Flexible flowlines and risers for Phase 3 in water depths of approximately 1,200 metres.

    Scope
    Other