Company Overview
TotalEnergies SE is a global integrated energy company headquartered in Courbevoie, France. Founded in 1924, it adopted the TotalEnergies name in 2021. The company produces and markets oil and biofuels, natural gas and low-carbon gases, renewables and electricity. Its activities also span refining and chemicals, energy supply, shipping, trading and marketing.
Core Businesses and Capabilities
TotalEnergies can manage a development from appraisal, development planning and FID through the owner-side coordination of FPSO, subsea, drilling and operational-readiness packages. Its LNG activities span gas production, liquefaction, shipping, trading and regasification; Integrated Power connects renewable generation, storage, trading and customer supply.
Deepwater Delivery Model
On a large deepwater development, TotalEnergies as operator establishes the development basis, capacity, schedule and interface boundaries, then organizes separate floating-production, subsea-system, SURF, drilling and O&M packages. This page lists only public projects that have completed review; projects supported only by internal review or media reporting are not added automatically.
Published Project Roles
| Project | Interest / Role | Development Status | TotalEnergies Responsibility |
|---|---|---|---|
| GranMorgu | 40% / Operator | Under construction; first oil targeted for 2028 | Coordinates FPSO, subsea-system, SURF, drilling and operational-readiness interfaces; APA 40%, Staatsolie 20% |
| Mero | 19.3% / Partner | Phased development and production | Participates in Brazil’s unitized Mero field; the partner interest is not presented as an operator role |
GranMorgu Execution Framework
| Package | Principal Contractor | Scope Boundary |
|---|---|---|
| FPSO | Technip Energies / SBM Offshore | Joint construction and installation; Fast4Ward hull, topsides and subsequent O&M |
| Subsea-system iEPCI | TechnipFMC | Subsea 2.0 production system, controls and flexible systems |
| SURF EPCI | Saipem | Production and injection flowlines, transportation and installation, pre-commissioning and start-up support |
| Drilling and completions | Halliburton | Long-term integrated well construction with digital and automated execution |
Principal Sources
TotalEnergies corporate website; GranMorgu FID announcement.
Related projects and roles
-
GranMorgu
Suriname's first large-scale offshore oil and gas development, centered on a newbuild FPSO.
OperatorTotalEnergies operates Block 58 and the GranMorgu development with a 40% interest, coordinating the FPSO, drilling and completions, and subsea production scopes.
- Scope
- Ownership and governance
- Relationship start
- 1 Oct 2024