PROJECT PROFILE

North Field West (NFW)

Qatar’s North Field West expansion adds 16 mtpa of planned LNG capacity and advances offshore jacket fabrication cooperation.

EPCC and jacket fabrication cooperation

Project overview

North Field West (NFW) is the western phase of the North Field expansion, linking offshore gas supply to two large LNG trains at Ras Laffan. Technip Energies, leading CCC and GAC, secured the onshore EPCC contract in February 2026. A QMW company release dated 4 September 2026 describes a jacket fabrication cooperation agreement with CPOE Qingdao.

The two NFW trains replicate the NFS design and add approximately 1.1 mtpa of CO₂ capture and sequestration capacity. Together, NFE, NFS and NFW are planned to take Qatar’s LNG capacity to 142 mtpa.

Offshore jackets and fabrication cooperation

The QMW–CPOE Qingdao agreement covers NFW jacket fabrication and is the first project implemented following their April 2026 comprehensive cooperation framework. It builds on their collaboration on projects including the Ruya EPC11 jackets.

Contract structure

Tier 1 comprises owner/operator awards and their consortium members. Tier 2 comprises major subcontractors and suppliers appointed directly by Tier 1 contractors.

Tier 1 | Direct contracts

Direct client / awarding party Contractor / consortium member Scope
QatarEnergy (formerly Qatar Petroleum) Technip Energies Leads CCC and GAC in delivering two 8 mtpa LNG trains and carbon-capture facilities.
QatarEnergy (formerly Qatar Petroleum) Consolidated Contractors Company Joint-venture partner in the NFW onshore EPCC contract led by Technip Energies.
QatarEnergy (formerly Qatar Petroleum) Gulf Asia Contracting Joint-venture partner in the NFW onshore EPCC contract led by Technip Energies.
QatarEnergy LNG Baker Hughes Six Frame 9 gas turbines, 12 centrifugal compressors, three Frame 6 turbines and three BRUSH generators.

Tier 2 | Major subcontracts

No major second-tier award with a confirmed direct client is listed in the available sources.

Other fabrication participants | Contract tier undisclosed

Direct client / awarding party Contractor / consortium member Scope
Not disclosed Qingdao McDermott Wuchuan Offshore Engineering Company Ltd. QMW–CPOE Qingdao jacket fabrication cooperation, described in QMW’s 4 September 2026 release; the upstream EPCI-to-fabrication award chain is not disclosed.
Not disclosed CNPC Offshore Engineering (Qingdao) Co., Ltd. QMW–CPOE Qingdao jacket fabrication cooperation, described in QMW’s 4 September 2026 release; the upstream EPCI-to-fabrication award chain is not disclosed.

MEED reported a McDermott award for four NFW jackets in January 2026. A primary award announcement and its contractual connection to QMW–CPOE fabrication have not been established. The report is therefore not shown as a confirmed Tier 1 contract.

Related developments

North Field East (NFE) | Al Shaheen Ruya

Sources

Baker Hughes: 2026 Q1 results; Technip Energies: NFW EPCC; MEED: NFW jacket award report; QMW company release, 4 September 2026;