Company overview
QMW is a 50/50 joint venture between J. Ray McDermott (Qingdao) Pte. Ltd. and Wuhan Wuchuan Investment Holding Co., Ltd. Its Qingdao yard provides project management, engineering, procurement, fabrication, construction and pre-commissioning for offshore and onshore energy structures.
The current yard profile lists about 60 hectares of total area, annual throughput up to 90,000 tonnes, a 300-metre skidway with 50,000-tonne loadout capacity, and a 210,000 m² core erection area.
Core capabilities
Representative project portfolio
| Project / portfolio | Region | Company role or scope |
|---|---|---|
| ONE GUYANA | Guyana | Three FPSO topsides modules |
| Scarborough FPU | Australia | Approximately 30,000-tonne topsides |
| Arctic LNG 2 | Russia | Three pre-assembled process module complexes |
| Al Shaheen Ruya | Qatar | EPCIC11 consortium member for nine platforms and jackets |
| North Field West | Qatar | Jacket fabrication cooperation with CPOE Qingdao |
| Umm Shaif Package 4 | United Arab Emirates | EPCI consortium member for jacket, topside and brownfield works |
NFW is recorded as a QMW-CPOE fabrication cooperation; the direct legal award chain was not disclosed.