COMPANY PROFILE

Offshore Oil Engineering Co., Ltd. (COOEC)

A China-based offshore energy engineering contractor spanning EPCI, deepwater and subsea systems, FPSOs, LNG, offshore wind and CCUS.

Company overview

Offshore Oil Engineering Co., Ltd. (COOEC) is a Shanghai-listed engineering company controlled by China National Offshore Oil Corporation. Headquartered in Tianjin Binhai New Area, it integrates design, procurement, fabrication, offshore installation, commissioning and maintenance. Its activities span offshore oil and gas, FPSOs and other floating facilities, LNG, offshore wind and CCUS.

COOEC reports more than 10,000 employees, fabrication bases covering about four million square metres in Tianjin, Qingdao, Zhuhai and other locations, and a specialist construction fleet of 19 vessels. Its project footprint spans more than 20 countries and regions.

Core capabilities

Offshore EPCIDeepwater & SubseaFPSO & FloatersLNG EngineeringOffshore WindCCUS

Representative project portfolio

Project / portfolio Region Company role or scope
Domestic deepwater portfolio Deep Sea No. 1, Haiji No. 1/2 and Haikui No. 1 Floating production, deepwater jackets and subsea systems
Petrobras P67/P70 Brazil / completed FPSO modules, integration, commissioning and delivery
Búzios P79 Brazil / fabrication Eleven topsides modules totalling about 22,000 tonnes, including partial design and procurement scope
Shell Penguins FPSO UK North Sea / completed Cylindrical FPSO hull and topsides fabrication, integration and commissioning
Saudi Aramco Marjan Saudi Arabia / delivered Platform fabrication, pre-commissioning and loadout
Al Shaheen Ruya Qatar / EPCIC execution Direct EPCI09 subsea contract; separate CPP fabrication participation
Hong Kong Offshore LNG Terminal Hong Kong / operating General contracting for offshore terminal and pipelines
Lufeng 16 MW TLP wind platform China / construction Deepwater floating wind platform engineering and fabrication

Project roles are stated by contract. Ruya EPCI09 and the separately reported CPP fabrication scope are retained as two distinct records.

Sources

COOEC: Corporate Profile; COOEC: 2025 Annual Report; COOEC: 2024 Results; COOEC: P67/P70; COOEC: P79; COOEC: Penguins; COOEC: Marjan; COOEC: Hong Kong LNG; COOEC: Lufeng Wind