NEWS · ANALYSIS · INDUSTRY KNOWLEDGE

Industry Content

Reporting, analysis and practical reference articles across maritime, shipbuilding, offshore engineering, oil and gas, LNG and energy equipment.

Company Roles

SBM Offshore and MODEC: Engineering Contractors, FPSO Owners or Operators?

Their project roles can combine FPSO engineering and delivery, asset ownership or leasing, and long-term operations and maintenance.

Read article →
Business Models

Why Oil Companies Do Not Own All the Offshore Assets They Use

Ownership decisions reflect utilisation, redeployment potential, capital requirements and operating capability—not simply whether an oil company can afford the asset.

Read article →
Maritime & Shipping

What Does a Shipbroker Actually Do?

A guide to chartering, sale and purchase, newbuilding and offshore brokerage, and the commercial value brokers bring to a transaction.

Read article →
Value Chain

Shipyards, Design Firms and Engineering Contractors: What's the Difference?

Their responsibilities may overlap, but their contracts, deliverables and accountability reveal the role each party actually plays in a project.

Read article →
Value Chain

Understanding the Shipbuilding and Offshore Engineering Value Chain

A seven-stage view of how vessels and offshore facilities move from project origination and front-end design to construction, delivery, operation and maintenance.

Read article →
Doosan Enerbility's 380 MW-class gas turbineEnergy Engineering

McDermott Enters the Race as AI Data Centres Open a New Gas-Fired Power EPC Market

Behind-the-meter generation is bringing gas-turbine manufacturers and EPC contractors into the fast-growing data-centre power market.

Read article →
FPSO ONE GUYANA during construction in SingaporeFPSO Market

FPSO Project Cycle Starts to Pay Off, Operator Results Show

Results from SBM Offshore, MODEC and BW Offshore show projects moving from construction into asset sales, production and long-term operations.

Read article →
Signing ceremony for Korea-US shipbuilding cooperation agreementsShipbuilding

US Shipbuilding Needs More Than Welders as South Korea Exports a Workforce Training System

Cooperation is expanding into instructors, curricula, registered apprenticeships and naval-architecture education.

Read article →
Floating offshore wind turbines in UK watersOffshore Wind

Floating Wind Could Supply More Than One-Third of UK Offshore Capacity by 2050

RenewableUK expects around 40 GW of floating wind as projects move into deeper and more remote waters.

Read article →
Naming ceremony for the 174,000-cubic-metre LNG carrier Greenergy RiverLNG Shipping

First Phase 2 Vessel Delivered as CNOOC's 12-Ship LNG Programme Passes Halfway Mark

Delivery of the 174,000-cubic-metre LÜ NENG CHUAN takes the long-term FOB shipping programme to seven vessels.

Read article →
FPSO operations in Guyana's Stabroek BlockFPSO

ExxonMobil Advances Guyana's Ninth FPSO, Considers Reusing Longtail Engineering

Haimara has entered environmental review as ExxonMobil evaluates applying Longtail engineering to the next development.

Read article →
Agogo FPSO operating offshore AngolaFPSO

Agogo FPSO Marks First Year Offshore Angola with Zero LTIs

Yinson Production reports a full year without a lost-time injury and high production uptime.

Read article →