COMPANY PROFILE · OFFSHORE ENGINEERING

Seatrium Limited

Integrated marine, offshore and energy infrastructure engineering

Company Overview

Seatrium Limited is a Singapore-headquartered marine, offshore and energy engineering group. Its legal lineage traces to Jurong Shipyard Limited, established in 1963, while the current group was formed in 2023 through the combination of Sembcorp Marine and Keppel Offshore & Marine.

Through its global yards, engineering teams and technology centres, the group serves energy companies, shipowners and operators across offshore production facilities, drilling rigs, offshore wind infrastructure, specialised vessels, repairs and upgrades.

Core Capabilities and Delivery Model

FPSO & FPUFLNG & FSRUOffshore Oil & Gas FacilitiesOffshore Wind & New EnergyDrilling Rigs & Specialised VesselsRepair, Upgrades & Life Extension

Seatrium’s delivery scope spans design, engineering, procurement, construction, transportation and installation, offshore hook-up and commissioning, supported by a multi-region network of shipyards for cross-border fabrication and integration.

Related projects and roles

  • Oil and gas development · Guyana

    Errea Wittu FPSO
    Integration assembler

    Installation and integration of topsides modules for the Errea Wittu FPSO in Singapore.

    Scope
    Offshore facilities and operations
    Relationship start
    6 May 2024
  • Oil and gas development · Guyana

    Whiptail

    The sixth Stabroek development, centered on the Fast4Ward FPSO Jaguar now under construction.

    Integration assembler

    Topsides fabrication and overall integration work for the Jaguar FPSO.

    Scope
    Offshore facilities and operations
    Relationship start
    16 May 2024
  • Oil and gas development · Brazil

    Búzios

    A major pre-salt field in Brazil's Santos Basin, developed in phases through 12 FPSO systems, with eight in production.

    Integration assembler

    Full-scope EPCC for P-78 and EPC delivery of P-80, P-82 and P-83.

    Scope
    Offshore facilities and operations
    Relationship start
    10 May 2021
  • Oil and gas development · Guyana

    Liza Phase 1

    The first offshore development in the Stabroek Block, producing through the Liza Destiny FPSO.

    Integration assembler

    Conversion, module integration and completion work for FPSO Liza Destiny at the Singapore yard.

    Scope
    Offshore facilities and operations
    Relationship start
    Nov 2017
  • Oil and gas development · Guyana

    Liza Phase 2

    The second Stabroek development, producing through Liza Unity, the first Fast4Ward FPSO.

    Integration assembler

    Topsides integration and completion of FPSO Liza Unity at the Singapore yard.

    Scope
    Offshore facilities and operations
    Relationship start
    2019
  • Oil and gas development · Guyana

    Payara

    The third Stabroek development, producing through the Fast4Ward FPSO Prosperity.

    Integration assembler

    Topsides integration and completion of FPSO Prosperity at the Singapore yard.

    Scope
    Offshore facilities and operations
  • Oil and gas development · Guyana

    Yellowtail

    The fourth Stabroek development, producing through the ONE GUYANA FPSO.

    Integration assembler

    Topsides fabrication, installation and integration, with pre-commissioning and commissioning support in Singapore.

    Scope
    Offshore facilities and operations
    Relationship start
    2022